FIELD PROJECTS

Field results, not theoretical outcomes.

All results are from documented field work. Selected projects below.

SUH-01 / LAND RECLAMATION / BULGARIA

Suhodol Municipal Landfill

A long-term reclamation project on a large municipal landfill, one of our most documented K2 applications. Targeted soil bacteria applied alongside selected plant species to neutralize pollutants and re-establish vegetation.

2010
SITE ASSESSED
No vegetation. Active leachate. Heavy contamination throughout.
2013
K2 FIRST APPLIED
Microbial inoculation carried out. Pioneer vegetation introduced.
2023
STABLE COVER
Self-sustaining vegetation. Soil indicators improved across the board.
Suhodol, after application
Suhodol, before application
BEFORE
AFTER
CIVIL WORKS / SLOPE STABILIZATION

Road and railway embankments, biological treatment applied directly on site.

CW-01 after, stabilized vegetation
CW-01 before, eroded embankment
BEFORE
AFTER
CW-01·SIMITLI, BULGARIA·2015

Unstable road embankment

K2 applied, vegetation established, slope stabilized.

CW-02 after, revegetated slope
CW-02 before, bare slope under construction
BEFORE
AFTER
CW-02·DOLNO KAMARTSI, BULGARIA·2017

Secondary road corridor

Erosion controlled, soil structure recovered.

CW-03 after, vegetated railway embankment
CW-03 before, bare railway embankment
BEFORE
AFTER
CW-03· RAZMENNA MESHTITSA·2025

Steep railway embankment

Soil amendment and vegetation program applied.

1-3 yrs
SOIL RECOVERY TIMELINE
10+ yrs
LONG-TERM MICROBIAL STABILITY
13 yrs
FIELD-VALIDATED TRACK RECORD

More fieldwork information available on request.

ASK US ABOUT OUR EXPERIENCE IN YOUR FIELD